How is party wall damage dealt with and who pays for it?

Information & Frequently Asked Questions

Is your neighbour about to begin a home renovation project that might include a loft conversion or an extension? Perhaps you are the homeowner embarking on an extensive property renovation project? Party wall Awards are of great importance to safeguard both parties from unnecessary disputes and conflict between neighbours.

Essentially, a party wall is the shared wall, usually between a terrace or semi-detached house, and divides the homes of two separate owners. It may also include garden walls built over a boundary and excavations close to a neighbour’s property (within three or six meters, depending on the depth of the new foundations). Party wall Awards are most commonly needed for building projects that involve loft conversions, basement excavations, internal renovation and extensions.

Damage caused by works notifiable under the party wall etc. 1996 Act to a neighbour’s (adjoining owner) property is referred to as party wall damage and in most cases the onus lies upon the building owner to make good the damage.

In an ideal situation, the following procedures should be undertaken:

  1. Building owner to serve the adjoining owner with Party Wall Notice(s).
  2. Appoint a Party Wall Surveyor acceptable to both owners or each owner to appoint their own surveyor.
  3. Complete a Schedule of Condition Report of the adjoining owner’s property
  4. appointed surveyor or surveyors to agree a Party Wall Award

So, what happens if the adjoining owner reports damage to his or her property because of the building work?

Once the appointed party wall surveyor(s) have been notified there are three possible routes to go down, all at the choice of the adjoining owner.

  1. Perhaps the most amicable route is when the building owner and the adjoining owner discuss and agree on a course of action without engaging the appointed party wall surveyor(s). In that scenario the two neighbours agree between themselves on arrangements for the damage to be made good or for a financial compensation to be made. The advantage for the building owner on perusing this course of action is that he will not have to incur the additional professional fee costs of the appointed surveyor(s). Note if the damage is minor the cost of surveyor’s fees could be greater than the cost of the repair works.
  2. The appointed surveyor(s) identify the scope of the repair works by cross-referencing the pre-works condition report and a written schedule of repair works is drawn up and agreed between them. The adjoining owner agrees for the building owner’s contractors to undertake the repair work scoped by the appointed surveyor(s). The adjoining owner may also request that the appointed party wall surveyor(s) confirm that repairs have been carried out satisfactorily on completion.
  3. The third route is as point 2 however instead of carrying the repairs the building owner agrees to pay the adjoining owner a financial compensation based on a determination made by the appointed surveyor(s). The adjoining owner can then choose to appoint his own contractor to carry out the works at his own convenience.

How is the cost of the repair determined?

This is probably the most important question with the potential to cause maximum conflict between neighbours. One of the ways the cost can be determined is to get quotes for the repair work from three contractors sourced by the party wall surveyor(s). The party wall surveyor(s) then selects the most appropriate contractor for the job and arranges to get the funds to the adjoining owner, enabling them to get the damage corrected.

Alternatively, The Royal Institute of Chartered Surveyors (RICS) recommends the use of a cost guide to determine repair costs. The Building Cost Information Service of BICS is the industry standard cost guide that most party wall surveyors refer to. Once the cost is determined, the building owner is notified to transfer the amount to the adjoining owner, allowing them to commence repair work.

Party Wall Damage?

The team at ESQ Associates are here to assist you with any queries you may have regarding party wall damage and issues.

Call us on our office number or drop us an email and one of our friendly staff will get back to you as soon as possible.

Need help? Call on:

07593 216 092

Party Wall F.A.Q.

We get asked questions all the time and we try and answer every single one. Here we have compiled a list of our most frequently asked questions. However, if your subject isn't listed, please, ask us a question.
Chimney breast removal

There is a trend for people to open-up their residential properties and remove chimney breasts, which are no longer in use. Click here to read more

Line of junction Notice

If you are planning an extension, particularly a side extension, you will need to consider issuing a Line of Junction notice to your neighbour. The Line of Junction is an imaginary line dividing the lands of two Adjoining Owners. Unlike a boundary line, the Line of Junction also extends upwards. Click here to read more

How is party wall damage dealt with and who pays for it?

Is your neighbour about to begin a home renovation project that might include a loft conversion or an extension? Perhaps you are the homeowner embarking on an extensive property renovation project? Party wall Awards are of great importance to safeguard both parties from unnecessary disputes and conflict between neighbours. Click here to read more

What is a party wall agreement?

When it comes to party walls, there are often several terms flying around that all sound like they are the same, but are in effect completely separate from each other. In our previous blogs, we have touched upon party walls, party structure notices, adjacent excavation notices and line of junction notices amongst others. Click here to read more

Loft conversions and the party wall etc Act 1996

Many people will wish to expand and enlarge their property for additional space, and going upwards seems to be popular, whether one is dealing with a residential property or a commercial office development. Click here to read more

Your neighbour has started or completed works without serving party wall Notice. Can I appoint a party wall surveyor and have a party wall Award?

Your neighbour has started or completed works without serving party wall Notice. Can I appoint a party wall surveyor and have a party wall Award? Click here to read more

What is a Party Structure Notice & when does it need to be issued?

Embarking on a property renovation project with an extension or a loft conversion is both an exciting and daunting prospect. There is much to plan, decisions to be made and permissions to be secured. One of the terms you may have heard mentioned by your architect or structural engineer is “Party Wall Award or Notice.” What exactly is a party wall notice and is it relevant to your building project? Click here to read more

What is an Adjacent Excavation Notice?

If you are planning to build an extension to your property which would involve excavating foundations, you may need to issue your neighbour or the adjoining owner with an Adjacent Excavation Notice. Click here to read more

Contact Us

Monument House

215 Marsh Road
Pinner
Middlesex
HA5 5NE